Permit No. 20066 – ARCF Project / Natomas PACR / NLIP, Phase 4b Landside Improvements Proj –Garden Hwy Utility Installation from Orchard Lane to Gateway Oaks Dr

41 Documents in Project

Summary

SCH Number
2009112025
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Permit No. 20066 – ARCF Project / Natomas PACR / NLIP, Phase 4b Landside Improvements Proj –Garden Hwy Utility Installation from Orchard Lane to Gateway Oaks Dr
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2026
Document Description
Approval of Permit No. 20066, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To install twenty-four (24) new wooden Douglas fir poles (10 poles on the waterside and 14 poles on the landside), with heights ranging from 30 to 50 feet, set at depths ranging from 5 to 7 feet below grade along the Garden Highway Levee from Orchard Lane to Gateway Oaks Drive, and to install an overhead communication line along these poles. The overhead communication line includes 5,746 linear feet of overhead line to be attached to seven (7) existing SMUD poles (Board Permit No. 19637-1) and the proposed AT&T poles. Four overhead communication line crossings will maintain a minimum clearance of 23 feet above the top of the levee. A total of 125 linear feet of excavation will occur (approximately 60 feet from the landside toe and on the waterside slope) to place 4-inch plastic ducts near four (4) poles to connect to the existing underground infrastructure. This utility relocation work is associated with Natomas Basin Civil Works Project Reach A construction.

Contact Information

Name
Jennifer Calles
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Name
Andrea Galeste
Agency Name
AT&T
Job Title
Project Manager
Contact Types
Project Applicant

Name
John Bassett
Agency Name
Sacramento Area Flood Control Agency
Job Title
Director of Engineering
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Regions
Northern California
Other Location Info
The project is located on Garden Highway between Orchard Lane and Gateway Oaks Drive, Sacramento, CA, at approximately 38.60533 °N, 121.52307 °W, at 38.60533°N 121.52307°W, Levee Mile 17.28 to 18.11, Sacramento River, Sacramento County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
The EIR, prepared by the lead agency for the project, is available to the general public at the lead agency’s office listed above. The Board’s administrative record related to the Board permit is available for public review at the Board’s office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print