Permit No. 15772-1: Natomas PACR/NLIP/Landside Improvement Phase 4b: Power Pole 37 Relocation
31 Documents in Project
Summary
SCH Number
2009112025
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Permit No. 15772-1: Natomas PACR/NLIP/Landside Improvement Phase 4b: Power Pole 37 Relocation
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2025
Document Description
Approval of Permit No. 15772-1, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To remove an existing Pacific Gas and Electric (PG&E) utility pole and the overhead electric lines, permitted under Board permit 15772 GM and issued to PG&E on January 15, 1992, and remount the overhead lines that cross the Natomas East Main Drainage Canal (NEMDC) right bank levee, onto a new pole located outside the levee prism. To permit the installation of two new guy wires and a power installed screw anchor (PISA) on an existing pole on the waterside. The overhead electric lines operate at 12,000 volts and will maintain a clearance of 29 feet above the top of the levee. This utility relocation work is associated with the Natomas Basin Civil Works Project, Reach F.
Contact Information
Name
Angela Nguyen-Tan
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
John Bassett
Agency Name
Sacramento Area Flood Control Agency (SAFCA)
Job Title
Director of Engineering
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Counties
Sutter
Regions
Northern California
Other Location Info
The project is located approximately 0.97 miles south of the East Levee Road and W. Riego Road intersection with the waterside pole approximately 110-feet to the East, in Sutter County.
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
Sacramento Area Flood Control Agency, 1007 7th Street, 7th Floor, Sacramento, CA 95814
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.