Permit No. 19979: Natomas PACR/NLIP/Landside Improvement Phase 4b: Power Pole 10 Station 654+40 Relocation

31 Documents in Project

Summary

SCH Number
2009112025
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Permit No. 19979: Natomas PACR/NLIP/Landside Improvement Phase 4b: Power Pole 10 Station 654+40 Relocation
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2025
Document Description
Approval of Permit No. 19979, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To upgrade an existing utility pole located on the waterside, located approximately 45 feet away from the levee toe, by replacing it with a 55-foot Class 2 wood pole set at a depth of 8.5 feet; and to remove an existing pole located at the landside levee toe and relocate it approximately 79 feet away from the levee toe. The PG&E electric line that crosses the Natomas East Main Drainage Canal right bank levee will be re-mounted on the relocated poles. The overhead electric line operates at 12,000 volts with a clearance of 39 feet above the levee. This utility work is associated with Natomas Basin Civil Works Project, Reach F.

Contact Information

Name
Angela Nguyen-Tan
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Name
John Bassett
Agency Name
Sacramento Area Flood Control Agency (SAFCA)
Job Title
Director of Engineering
Contact Types
Lead/Public Agency

Location

Counties
Sutter
Regions
Northern California
Other Location Info
The project is located half a mile south of the Natomas Road and Sankey Road intersection, in Sutter County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
Sacramento Area Flood Control Agency, 1007 7th Street, 7th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print