West Park High School Classroom Building and Performing Arts Center Phase IV Project

7 Documents in Project

Summary

SCH Number
2009102010
Lead Agency
Roseville Joint Union High School District
Document Title
West Park High School Classroom Building and Performing Arts Center Phase IV Project
Document Type
NOD - Notice of Determination
Received
Posted
10/16/2026
Document Description
The proposed project involves construction of two new buildings at West Park High School: a three-story academic classroom building (Building V) and a performing arts center (Building J). Together, the buildings would add approximately 75,695 square feet of building area to the campus and would have a maximum height of 55 feet. West Park High School is a comprehensive public high school serving students in grades 9 through 12 and is planned to accommodate up to 3,200 students at buildout. The project would also include associated landscaping, hardscape, pedestrian improvements, and underground utilities. Pedestrian access would be provided by on-site walkways designed to provide safe, accessible routes consistent with applicable accessibility requirements. The project site is in the northwestern portion of the campus on vacant land that was previously graded during Phase I development. The site is currently undeveloped and contains no buildings or structures. Panther Place borders the site to the north, an existing parking lot and internal vehicular circulation are located immediately to the east, and classroom buildings are located to the west and south. The surrounding school facilities, including facilities currently under construction as part of Phase II, are components of the previously approved project. The proposed project would not modify the existing parking configuration or on-site vehicular circulation.

Contact Information

Name
Scott Davis
Agency Name
Roseville Joint Union High School District
Job Title
Director, Facilities Development
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Roseville
Counties
Placer
Regions
Northern California
Cross Streets
High School Road and Hayden Parkway
Zip
95747
Total Acres
52.85
Parcel #
017-101-030-000
State Highways
SR-65
Railways
N/A
Airports
N/A
Schools
Junction Elementary School, Woodcreek Montessori School, Coyote
Waterways
Coyote Creek and Pleasant Grove Creek
Township
11N
Range
5E
Section
S24

Notice of Determination

Approving Agency
Roseville Joint Union High School District Board of Trustees
Approving Agency Role
Lead Agency
Approved On
County Clerk
Placer
Final Environmental Document Available at
2 Tiger Way, Building #2, Roseville, California 95678

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print