La Forest Reservoir Improvement Project

2 Documents in Project

Summary

SCH Number
2007071164
Lead Agency
La Canada Irrigation District
Document Title
La Forest Reservoir Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/19/2026
Document Description
The La Cañada Irrigation District LCID is proposing to construct a new water storage reservoir to provide additional domestic water storage and fire flow capability in Pressure Zones 1 and 2. The specific improvements include a new above-ground 2.0 million gallon steel reservoir, 2.0-million-gallon above-ground welded steel water reservoir, a new paved access road, retaining walls, and new stormwater facilities with a drain pipe. The reservoir would be located about 750 feet north of the existing terminus of La Forest Drive in the City of La Canada Flintridge.

Contact Information

Name
Justin Bailey
Agency Name
La Cañada Irrigation District
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
La Canada-Flintridge
Counties
Los Angeles
Regions
Southern California
Cross Streets
La Forest Drive and Los Amigos Street
Zip
91011
Total Acres
5
Parcel #
586-403-1010; 586-403-1011; 586-400-2019; and 586-400-2018
State Highways
I-210
Schools
See Other Information below
Township
2N
Range
13W
Section
26
Base
SBBM
Other Information
Palm Crest Elementary School; Paradise Canyon Elementary School; La Cañada High School; Flintridge Preparatory School; St. Bede the Venerable Catholic School; Foothill Progressive Montessori School

Notice of Determination

Approving Agency
La Cañada Irrigation District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
La Cañada Irrigation District, 1443 Foothill Boulevard, La Cañada Flintridge, CA 91011

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print