California High-Speed Rail Project - Los Angeles to Anaheim Project Section
4 Documents in Project
Summary
SCH Number
2007031067
Lead Agency
California High Speed Rail Authority
Document Title
California High-Speed Rail Project - Los Angeles to Anaheim Project Section
Document Type
NOD - Notice of Determination
Received
Posted
11/2/2026
Document Description
The California High-Speed Rail Authority (Authority) certified a Statewide Program Environmental Impact Report/Environmental Impact Statement (EIR/EIS) (Tier 1) in November 2005 as the first phase of a tiered environmental review process for the proposed California High-Speed Rail (HSR) System planned to provide a reliable, high-speed, electric-powered rail system that links the major metropolitan areas of the state and that delivers predicable and consistent travel times. A further objective of the system is to provide an interface with commercial airports, mass transit, and the highway network and to relieve capacity constraints of the existing transportation system as increases in intercity travel demand in California occur, in a manner sensitive to and protective of California's unique natural resources.
Based on the Program EIR/EIS, the Authority selected preferred corridors and station locations to advance for additional study. The Authority has prepared an EIR/EIS that further examines the Los Angeles to Anaheim Project Section at the project level (Tier 2), within Los Angeles and Orange County. The project includes construction and operation of new and upgraded track, overhead contact system, maintenance and traction power facilities, grade separations, drainage improvements, communications towers, security fencing, modifications to passenger train stations, and other necessary facilities between Los Angeles and Anaheim, including an HSR station at Anaheim Regional Transportation Intermodal Center in Anaheim (ARTIC).
The Los Angeles to Anaheim Project Section is approximately 30 miles in length and traverses urban areas. From the north, this project section begins from south of LAUS at the northern edge of U.S. Highway 101 and travels through the cities of Los Angeles, Vernon, Commerce, Bell, Montebello, Pico Rivera, Norwalk, Santa Fe Springs, portions of unincorporated Los Angeles County, La Mirada, Buena Park, Fullerton, and Anaheim where it terminates at ARTIC. The proposed alignment would introduce HSR service into the existing Los Angeles–San Diego–San Luis Obispo Rail Corridor.
See Exhibit A for an illustration of the Los Angeles to Anaheim Project Section.
Through Resolution # HSRA 26-15, the Authority has approved Shared Passenger Track Alternative A for the Los Angeles to Anaheim Project Section, which includes the 26th Street Light Maintenance Facility and no optional intermediate stations.
Contact Information
Name
Stefan Galvez-Abadia
Agency Name
California High-Speed Rail Authority
Job Title
Director of Environmental Services
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Anaheim, Bell, Buena Park, Commerce, Fullerton, La Mirada, Los Angeles, Montebello, Norwalk, Pico Rivera, Santa Fe Springs, Vernon
Counties
Los Angeles, Orange
Regions
Southern California
Cross Streets
N Alameda Street and E Cesar E. Chavez Avenue, Los Angeles, CA 90012
Zip
90012
Total Acres
30 miles
Jobs
24140
Parcel #
See "Other Location Info"
State Highways
5, 10, 57, 91, 605, 710
Railways
LOSSAN; Amtrak, BNSF, UPRR
Airports
Fullerton Municipal Airport
Schools
See "Other Location Info"
Waterways
See "Other Location Info"
Township
1S
Range
13W
Section
S27
Base
San Bern
Other Location Info
Location Details:
The northern project terminus for the Los Angeles to Anaheim Project Section is just south of Los Angeles Union Station (LAUS) in the City of Los Angeles, California (latitude/longitude: 34°03'15"N, 118°14'44"W). LAUS is located at 800 N. Alameda Street, Los Angeles, CA 90012.
The southern project terminus is the Anaheim Regional Transportation Intermodal Center (ARTIC) in the City of Anaheim, California (latitude/longitude: 33°48'10"N, 117°52'39"W). ARTIC is located at 2626 E. Katella Avenue, Anaheim, CA 92806.
Longitude/Latitude:
Northern project terminus: 34°03'15"N, 118°14'44"W
Southern project terminus: 33°48'10"N, 117°52'39"W
Zip Codes:
The following ZIP codes are intersected by the project footprint and a 0.5-mile buffer surrounding the project footprint:
90012, 90013, 90021, 90023, 90031, 90033, 90040, 90058, 90201, 90605, 90606, 90621, 90638, 90640, 90650, 90660, 90670, 92801, 92802, 92805, 92806, 92831, 92832, 92833, 92867, and 92868.
Source:
California High-Speed Rail Authority (2025), Los Angeles to Anaheim Project Section Community Impact Assessment; Esri (2025), U.S. ZIP Code Areas.
Parcel Numbers:
Assessor's Parcel No.: Refer to Final EIR/EIS Appendix 3.1-B, Los Angeles to Anaheim Footprint Mapbook.
Schools:
Educational facilities within 0.25 mile of the project footprint include: FIRST 5 LA; Jesus’ Hands Union Station Gateway Child Development; Dream-I Education Center; Harry Pregerson Child Care Center; Evergreen Preschool; Proyecto Pastoral at Dolores Mission (Women’s Cooperative Child Care Center); Sunny Hills Preschool; Nishi Hongwanji Child Development Center - Day Care Center; Fullerton Children's Academy; Felicitas and Gonzalo Mendez High; Bumble Bee Christian Learning Center; Childtime of Commerce; Arborland Montessori; Maof Child Care Center; Wilshire Avenue Preschool; Plaza de la Raza / Maizeland Elementary; Color Our World Daycare; St. Marianna de Paredes School; Pacific Drive Elementary School; Pioneer High School; Fullerton First United Methodist Preschool; Los Nietos Middle School; Maple Elementary; Rio Hondo College Fire Academy; Richman Elementary School; John Glenn High School; Anaheim Montessori Academy; Eagle's Nest Preschool and Infant Center; Zion Lutheran Early Childhood Education Center (ECEC); YMCA of Greater Whittier - La Mirada Youth Services Center; Zion Lutheran School; Escalona Elementary School; Thomas Jefferson Elementary; Froebel Daycare; Olive Street Elementary; La Mirada Adult Center (Cerritos College La Mirada Campus); Little Blessings Preschool Academy; LiMai Montessori Academy; and QPE Technical Institute.
Waterways:
The Shared Passenger Track Alternatives would cross 11 water features: Los Angeles River, Hobart Channel, Rio Hondo, San Gabriel River, North Fork Coyote Creek, La Mirada Creek, Coyote Creek, Brea Creek, Balcom Avenue Storm Drain, Fullerton Creek, and Carbon Creek.
Section/Township/Range/Base:
Northern project terminus: Section 27, Township 1 South, Range 13 West, San Bernardino Meridian.
Southern project terminus: Section 25, Township 4 South, Range 10 West, San Bernardino Meridian.
Notice of Determination
Approving Agency
California High-Speed Rail Authority
Approving Agency Role
Lead Agency
Approved On
County Clerks
Los Angeles, Orange
Final Environmental Document Available at
CAHSRA Website: https://hsr.ca.gov/program-areas/environmental-planning/environmental-documents/project-section-environmental-documents-tier-2/los-angeles-to-anaheim-project-section-environmental-documents/
Repository Locations: Please visit above CAHSRA Website for repository locations and access to electronic copies (USB flash drive) are available for review during facility operating hours.
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
