Permit No. 19780 – Tidewater Crossing Master Development Plan Project - French Camp Slough Strom Dain Outfall Structure
11 Documents in Project
Summary
SCH Number
2005122101
Lead Agency
City of Stockton
Document Title
Permit No. 19780 – Tidewater Crossing Master Development Plan Project - French Camp Slough Strom Dain Outfall Structure
Document Type
NOD - Notice of Determination
Received
Posted
9/11/2025
Document Description
Approval of Permit No. 19780, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To construct a storm drain outfall structure along the waterside of the left (southwest) bank levee of French Camp Slough to discharge treated storm water from a proposed landside detention basin via a pump station and two (2) 16-inch diameter force mains. Armorflex matting to be installed below the outfall and extend into the channel for erosion protection. A temporary sheet pile coffer dam will be utilized for the outfall construction.
Contact Information
Name
Jordan Robbins
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Responsible Agency
Phone
Name
Anson Lihosit
Agency Name
City of Stockton
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Name
Matt Arnaiz
Agency Name
Armoto Partners, LLC
Job Title
Undisclosed
Contact Types
Project Applicant
Phone
Email
Location
Coordinates
Cities
unincorporated
Counties
San Joaquin
Regions
Northern California
Waterways
French Camp Slough
Other Location Info
The project is located approximately 0.5 miles downstream where S. Airport Way crosses French Camp Slough, in the community of French Camp, just south of the City of Stockton, San Joaquin County (37.8868782°, -121.2553862°).
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
The EIR, prepared by the lead agency for the project, is available to the general public at the lead agency’s office listed above. The Board’s administrative record related to the encroachment permit is available for public review at the Board’s office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
