American River Watershed Common Features 2016 Project, Flood Risk Management Project

58 Documents in Project

Summary

SCH Number
2005072046
Lead Agency
Central Valley Flood Protection Board
Document Title
American River Watershed Common Features 2016 Project, Flood Risk Management Project
Document Type
NOD - Notice of Determination
Received
Posted
7/22/2025
Document Description
The Flood Risk Management Project consists of design refinements to the authorized 2016 ARCF Project, including engineering design modifications, footprint expansions, and compensatory habitat mitigation approaches. The design refinements include actions within eight major project components: Magpie Creek Project; American River Erosion Contracts 3B North, 3B South, 4A, and 4B; Sacramento River Erosion Contract 3; American River Mitigation Site; Sacramento River Mitigation Site, and installation of a Piezometer Network. The purpose of the Flood Risk Management Project is to address slope stability and erosion concerns along the levees of the American and Sacramento Rivers to reduce the overall flood risk.

Contact Information

Name
Josh Brown c/o Department of Water Resources
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Regions
Northern California
Other Location Info
The Flood Risk Management Project is located at several distinct locations where its components would be constructed, including Magpie Creek, and approximately 12 miles of the north and south banks of the American River immediately upstream from the confluence with the Sacramento River and approximately 14 miles of levees along the east bank of the Sacramento River downstream from the American River to just below the town of Freeport, in Sacramento County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
The Subsequent EIR, with comments and responses, and record of approval is available to the general public at the Board’s office listed above. The final Supplemental Environmental Impact Statement/Subsequent Environmental Impact Report can be viewed at https://www.spk.usace.army.mil/Missions/Civil-Works/Sacramento-Levee-Upgrades/American-River-Levees/

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.