Concurrence on the Issuance of a Revised Solid Waste Facilities Permit - Facility #15-AA-0311 Mt. Vernon Avenue Discarded Materials Handling Facility
3 Documents in Project
Summary
SCH Number
2003121103
Lead Agency
Kern County
Document Title
Concurrence on the Issuance of a Revised Solid Waste Facilities Permit - Facility #15-AA-0311 Mt. Vernon Avenue Discarded Materials Handling Facility
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2026
Document Description
The changes that will be authorized by the proposed permit include:
1. Addition of Municipal Solid Waste (MSW) stream to existing transfer operations. The current permit prohibits the acceptance of MSW; the proposed permit removes MSW from the list of prohibited wastes.
2. Removing activity-specific maximum tonnages to allow for flexibility within each activity while keeping the same total permitted maximum tonnage of 1,551 TPD.
Contact Information
Name
Isabelle Maalouf
Agency Name
CalRecycle / WPCMD
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
James Leonard
Agency Name
City of Bakersfield
Job Title
Solid Waste Director
Contact Types
Project Applicant
Phone
Location
Cities
Bakersfield
Counties
Kern
Regions
Southern California
Zip
93307
Other Location Info
2601 South Mt. Vernon Ave
Bakersfield, CA 93307
Notice of Determination
Approving Agency
CalRecycle
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
Custodian of Records, CalRecycle, Attn: Legal Office, 1001 I Street, P.O. Box 4025, Sacramento, CA 95812
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum #2 to Previous Mitigated Negative Declaration)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A