Sinkyone Wilderness State Park Coastal Watershed Road Removal Project
    3 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                    
                
        
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
        
            
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2003022040
            
        
                    Lead Agency
            
            
                California Department of Parks and Recreation
                
            
        
                Document Title
            
            Sinkyone Wilderness State Park Coastal Watershed Road Removal Project
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    3/11/2003
                
            
                    Present Land Use
                
                
                    Recreation
                
            
                Document Description
            
            -Full road contouring of approximately 40 miles of abandoned, unstable service and skid roads within the coastal sub-watersheds.  The work would include excavation of embankment fill from roads and stabilization of excavated materials on cutbench to fully recontour to natural (pre-disturbance) topography.  Project would stabilize approximately 130,000 cubic yards of road fill that is potentially deliverable to streams if left untreated.
-Removal of fill material from 203 stream crossings associated with the service and skid roads indicated above.  The majority of the crossings have no flow during the construction season and are typically small fill crossings.  Stream crossing removal includes excavation of road and landing fill from road/stream channel crossings and stabilization of excavated materials.  Stream channel bed, banks, and adjacent slopes would be restored to their pre-crossing configuration and longitudinal stream gradient reestablished through the crossing site.  Project would remove approximately 55,489 cubic yards of potentially deliverable sediment from these stream crossing sites.
        Contact Information
                        Name
                    
                    
                        Shaelyn Raab Strattan
                    
                
                        Agency Name
                    
                    
                        Department of Parks and Recreation
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Counties
                
                Humboldt
            
                    Cross Streets
                
                
                    State Highway 1
                
            
                    State Highways
                
                
                    1
                
            
                    Waterways
                
                
                    Coastal Watersheds
                
            
                    Other Location Info
                
                
                    Leggett
                
            Notice of Determination
                        Approving Agency
                    
                    
                        California Department of Parks and Recreation                   
                    
                
                            Approving Agency Role
                        
                        
                            Lead Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
