New Burbank Central Library and Civic Center Project

3 Documents in Project

Summary

SCH Number
2003021053
Lead Agency
City of Burbank
Document Title
New Burbank Central Library and Civic Center Project
Document Type
NOD - Notice of Determination
Received
Posted
4/24/2026
Document Description
The Project proposes to construct a new Burbank Central Library and Civic Center development: (1) new combined Central Library and Civic Center building – four (4)-stories with up to 119,000 square feet of floor area; (2) new above-grade parking garage structure – 4-stories with 310 parking stalls; (3) new public plaza and open space area – 42,430 square feet of area; and new site, circulation, streetscape improvements – 32,440 square feet of area. The Project in-volves the demolition/removal of the existing Administrative Services Building, Bike Angel portable structure, vacant commercial building, and the existing surface parking lots. The existing Community Services Building will remain.

Contact Information

Name
David Y. Kim
Agency Name
City of Burbank
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Houston Drum
Agency Name
MOCA Systems, Inc.
Job Title
Vice President
Contact Types
Project Applicant

Location

Cities
Burbank
Counties
Los Angeles
Regions
Citywide, Southern California
Cross Streets
North Glenoaks Boulevard, East Olive Avenue, North Third Street, East Orange Grove Avenue
Zip
91502
Total Acres
3.6
Parcel #
Multiple APNs.

Notice of Determination

Approving Agency
City of Burbank
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.burbankca.gov/web/community-development/301-e.-olive-ave.-new-central-library

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to Adopted Mitigated Negative Declaration )
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print