Copper Mountain College Pipeline
    3 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                    
                
        
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
        
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2002101117
            
        
                    Lead Agency
            
            
                Joshua Basin Water District
                
            
        
                Document Title
            
            Copper Mountain College Pipeline
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    3/4/2003
                
            
                    Present Land Use
                
                
                    RS 1 / RM
                
            
                Document Description
            
            The proposed pipeline project would be designed and constructed by the Joshua Basin Water District as an extension of their existing domestic water distribution system. The existing Copper Mountain College (CMC) facility is near the eastern limit of the District's service area and is not currently connected to the District's water distribution system. The CMC currently pumps water using a well with a storage tank. The Copper Mountain College is planning a substantial expansion of its facilities. The proposed expansion will require more water than the current well can produce and the Fire Department flow requirements for the CMC make connection to the Joshua Basin Water District's system neccessary. The District's current distribution system on the north side of State Highway 62 ends at Sunfair Road; approximately two miles west of Rotary Way. There are three residences along the north side of the highway which also need water and fire protection.
        Contact Information
                        Name
                    
                    
                        Terry Lyons
                    
                
                        Agency Name
                    
                    
                        Joshua Basin Water District
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Counties
                
                San Bernardino
            
                    Cross Streets
                
                
                    Sunfair/Rotary & Hwy 62
                
            
                    Zip
                
                
                    92252
                
            
                    State Highways
                
                
                    62
                
            
                    Schools
                
                
                    Copper Mtn. College
                
            
                    Township
                
                
                    1N
                
            
                    Range
                
                
                    7E
                
            
                    Section
                
                
                    26, 27
                
            
                    Base
                
                
                    S. Bdo.
                
            Notice of Determination
                        Approving Agency
                    
                    
                        Joshua Basin Water District                                     
                    
                
                            Approving Agency Role
                        
                        
                            Lead Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
