P. Kay Metal, Inc. – Class 1* Permit Modification

4 Documents in Project

Summary

SCH Number
2002081135
Lead Agency
City of Vernon
Document Title
P. Kay Metal, Inc. – Class 1* Permit Modification
Document Type
NOD - Notice of Determination
Received
Posted
10/26/2026
Document Description
The California Department of Toxic Substances Control (DTSC), pursuant to authority granted under Division 4.5, California Code of Regulations, Title 22, Chapter 20 prepared an Addendum pursuant to a previously adopted 2002 Initial Study/Negative Declaration (IS/ND) to evaluate activities associated with a Class 1* Permit Modification request to the Closure Plan under the Hazardous Waste Facility Permit (Permit) for P. Kay Metal, Inc. (Facility). The Class 1* Permit Modification will authorize the Facility to implement modifications to the performance standards for the Closure Plan. The Facility will continue all other activities consistent with the previously approved Closure Plan authorized under the Permit. There are no operational changes or other physical changes that require construction or ground disturbance for the proposed Permit Modification. Background: P. Kay Metal, Inc. is an inactive commercial hazardous waste storage and treatment facility located at 2448 East 25th Street in Los Angeles, California 90058. The Facility formerly reclaimed lead and tin metal from off-site generated solder dross and recycled those metals into new solder and alloys in the electronics and radiator industry. The Facility consists of a main building (which houses the administrative office, a laboratory, manufacturing area, three container storage areas and treatment unit), an employee parking area, two truck parking and loading/unloading areas, and a fourth container storage area. The Facility’s treatment process was conducted inside the main building. The treatment process used two furnaces (melting pots) to melt the solder dross to separate and reclaim the metal. The recovered metal was poured into molds to produce bars, ingots, and sows. Bars and ingots were sold to customers and the sows were stored at the Facility to produce bars and ingots to customer specifications. Bars were also extruded at the Facility in the manufacturing area to produce thin wire to be sold to customers. The Permit Modification will authorize the Facility to implement modifications to the previously approved Closure Plan, specifically revising the performance standards as follows: • Concrete chip samples will be changed from background levels to soil screening levels per DTSC’s Human and Ecological Risk Office (HERO) Note 3, June 2020 – Revised May 2022 and U.S. Environmental Protection Agency’s (USEPA’s) EPA Regional Screening Levels (RSLs), November 2023. Additionally, the sample locations will exclude exterior areas identified in the Closure Plan. • Wipe samples will be changed from non-detect based on practical quantitation limits to focus on lead dust concentrations as the standard. Additionally, the sample locations will exclude exterior areas identified in the Closure Plan. • Revise the performance standards for soil samples from background soil sample results to health risk-based screening levels per DTSC’s HERO Note 3, June 2020 – Revised May 2022 and USEPA’s EPA Regional Screening Levels RSLs, November 2023.

Contact Information

Name
Paulette Penton
Agency Name
Department of Toxic Substances Control
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Daniel Wall
Agency Name
City of Vernon
Job Title
Director Of Public Works
Contact Types
Lead/Public Agency

Name
Larry Kay
Agency Name
P. Kay Metal, Inc.
Job Title
Chief Executive Officer at P Kay Metal Inc.
Contact Types
Project Applicant

Location

Cities
Los Angeles
Counties
Los Angeles
Regions
Southern California
Zip
90058
Other Location Info
2448 East 25th Street, Los Angeles, CA 90058

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
www.envirostor.dtsc.ca.gov/public/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.