Castaic Lake Water Agency Expansion of Earl Schmidt Filtration Plant Expansion of Earl Schmidt Filtration Plant
    4 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                    
                
        
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
        
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2002061061
            
        
                    Lead Agency
            
            
                Castaic Lake Water Agency
                
            
        
                Document Title
            
            Castaic Lake Water Agency Expansion of Earl Schmidt Filtration Plant Expansion of Earl Schmidt Filtration Plant
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    4/11/2003
                
            
                    Present Land Use
                
                
                    Public Facilities, Open Space
                
            
                Document Description
            
            CLWA, the lead agency of compliance with the California Environmental Quality Act (CEQA), plans to upgrade and expand the treatment system of the existing ESFP from 33.6 million gallons per day (mgd) to 56 mgd.  Originally built in 1980 and expanded in 1987, the ESFP treats surface water supplied to CLWA by the State Water Project (SWP). The project includes several main components: improvements to the existing water conveyance system, including replacement of the existing raw water pumping plant, referred to as the IPS, with a 56 mgd capacity pump facility and installation of a 54-inch bypass pipeline within the existing IPS easement to improve the raw water gravity flow system; and at the filtration plant, construction of a new structure containing new ozone facilities for primary disinfection and chemical system for secondary disinfection; pre-filtration improvements including new contact clarifiers and other equipment within a new structure; conversion of filtration system deep bed monomedium filters using anthrasite filter media and related equipment upgrades; and modifications to the washwater recovery system including installation of a new treatment system within an existing structure.  The additional pipelines and piping systems for the project would not require acquistion of additional easements or right-of-way.  The existing ESFP septic system would also be replaced with a septic system of the same capacity at the ESFP site.
        Contact Information
                        Name
                    
                    
                        Michael Thompson
                    
                
                        Agency Name
                    
                    
                        Castaic Lake Water Agency
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Counties
                
                Los Angeles
            
                    Zip
                
                
                    91350
                
            
                    State Highways
                
                
                    5
                
            
                    Other Location Info
                
                
                    Castaic
                
            Notice of Determination
                        Approving Agency
                    
                    
                        Castaic Lake Water Agency                                       
                    
                
                            Approving Agency Role
                        
                        
                            Lead Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            Yes
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            Yes
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
