Streambed Alteration Agreement R3-2001-0851/1-98-254 SON
Summary
                SCH Number
            
            
                2002029006
            
        
                    Lead Agency
            
            
                California Department of Forestry and Fire Protection
                (CAL FIRE)
            
        
                Document Title
            
            Streambed Alteration Agreement R3-2001-0851/1-98-254 SON
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    2/4/2002
                
            
                Document Description
            
            The applicant proposes three activities: 1.) Install a permanent steel bridge over a Class I watercourse (Kohute Gulch) along an existing seasonal road at crossing location #16 (see road map in timber harvest plan).  Bridge abutments will be located outside of the watercourse's channel, and will be made of concrete or large rock.  Abutments will be constructed using an excavator, crawler, tractor and/or backhoe.  A crane will be used to place the bridge on the abutments.  One alder, one willow, several Douglas fir seedlings, and some ferns will be removed during the bridge construction.  2.) Replace existing permanent culverts over Class II watercourse along existing seasonal road at crossing locations #2 and #3.  At crossing #2, an existing 30-inch culvert will be replaced by a new permanent 36-inch culverts positioned side-by-side.  Perched fill near the outlet of the culvert will be moved back to increase bank stability.  At crossing #3, an existing 24-inch culvert will be replaced by a new 36-inch permanent culvert.  An excavator, tractor, and/or backhoe will be used to remove and install culverts.  As these permanent culvert crossings are existing crossings, very little soil, sand, gravel, or rock will be removed or displaced.  3.) A 0.10-acre man-made pond will be drained to improve slope stability.  The pond will be drained slowly, after which an excavator, crawler tractor, and/or bakchoe will be used to breach the pond banks.  After the pond has been drained, the earthen dam at the leading edge of the pond will be pulled back from the more unstable slopes, and the soil (approximately 10 cubic yards) will be spread on the more stable portions of the area away from any watercourse.  The California Department of Fish and Game (DFG) is executing a Lake and Streambed Alteration Agreement 2001-0851, pursuant to Section 1603 of the Fish and Game Code to the project applicant, Mr. Jeff Longcrier, North Coast Resource Management.
        Contact Information
                        Name
                    
                    
                        Stacy Martinelli
                    
                
                        Agency Name
                    
                    
                        California Department of Fish and Game
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Cities
                
                Yountville
            Notice of Determination
                        Approving Agency
                    
                    
                        California Department of Fish and Game                          
                    
                
                            Approving Agency Role
                        
                        
                            Responsible Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            N/A
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            N/A
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            N/A
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.