2025 Concurrence in the Issuance of a Revised Solid Waste Facilities Permit - Facility No 52-AA-0027 for Tehama County/Red Bluff Materials Recovery Facility

5 Documents in Project

Summary

SCH Number
2001092099
Lead Agency
Tehama County
Document Title
2025 Concurrence in the Issuance of a Revised Solid Waste Facilities Permit - Facility No 52-AA-0027 for Tehama County/Red Bluff Materials Recovery Facility
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2025
Document Description
The changes that will be authorized by the issuance of the proposed permit include: 1. An increase to the combined Permitted Traffic Volume for the Materials Recovery Facility (MRF) and the separately permitted Tehama County/Red Bluff Landfill (SWIS #: 52-AA-0001) from 400 to 600 vehicles per day. 2. Updates to the Transfer Processing Report.

Contact Information

Name
Kelsey Orr
Agency Name
CalRecycle
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Kristopher Adair
Agency Name
Madera Disposal Systems, Inc.
Job Title
Landfill Manager
Contact Types
Project Applicant

Location

Cities
Red Bluff
Counties
Tehama
Regions
Countywide
Zip
96080
Other Location Info
19995 Plymire Road, Red Bluff, CA 96080

Notice of Determination

Approving Agency
CalRecycle
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Tehama
Final Environmental Document Available at
CalRecycle, 1001 I Street, PO Box 4025, Sacramento, CA 95812-4025

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to the Negative Declaration (SCH#: 2001092099) was adopted for this project.)
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search Print