Project Avalon at Pacific Pointe West

9 Documents in Project

Summary

SCH Number
2001051048
Lead Agency
City of Long Beach
Document Title
Project Avalon at Pacific Pointe West
Document Type
NOD - Notice of Determination
Received
Posted
4/6/2026
Document Description
The modified project would modify a portion of the approved project evaluated in the 2004 Certified EIR, which is located entirely within the City of Long Beach, to add a four-level, approximately 862,063-square-foot parking structure with a maximum of 2,850 parking stalls (to replace two previously-approved buildings) and the construction of two new office buildings (Buildings 20 and 21) totaling 256,547 square feet of building area (previously approved at 190,007 square feet total).

Contact Information

Name
Scott Mulkay
Agency Name
Sares Regis Commercial
Job Title
Senior Vice President - Commercial Development
Contact Types
Project Applicant

Name
Amy Harbin
Agency Name
City of Long Beach
Job Title
Planner V
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Regions
Citywide
Cross Streets
The SE corner of Cover Street and Conant Street
Zip
90808
Total Acres
18.3
Jobs
1000
Parcel #
7149001169, 7149001167, 7149001068 and 7149001170
State Highways
State Highway 91 and I 405
Railways
Union Pacific Railroad
Airports
Long Beach Airport

Notice of Determination

Approving Agency
City of Long Beach City Council
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
411 W. Ocean Blvd., 2nd Floor, Long Beach, CA 90802

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Program EIR Compliance Checklist)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print