State Route 46 - Corridor Improvement Project Phase 3 - Agreement 2011-0206-R4
    28 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
                    
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2000011033
            
        
                    Lead Agency
            
            
                California Department of Transportation, District 5
                
            
        
                Document Title
            
            State Route 46 - Corridor Improvement Project Phase 3 - Agreement 2011-0206-R4
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    10/22/2012
                
            
                Document Description
            
            The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant. Caltrans proposes the following activities: Replacement of the existing bridge on SR 46 where it croses the Estrella River which is currently a 39 foot wide, 290 foot long four span bridge will be replaced with a new 40 foot 6 inch wide, 307 foot long two span bridge. The existing bridge would be removed first. Working from the bridge deck, an excavator with hoe-ram attachment would break the concrete free from the steel and then the steel girders would then be removed. The east abutment will be removed and re-compacted before beginning construction of the new bridge. The new bridge would be constructed using cast-in-drilled-hole (CIDH) piles. Some construction equipment will need to enter the channel, but work will not be done in the wetted portion of the channel. The Project will require cutting, 11 Fremont's Cottonwood, 7 red willows, and 1 valley oak. Vegetation would be cut to ground level with roots left intact for most of the area. After remoal of the vegetation, clean fill would be placed to create a level work area. Upon project completion the fill would be removed down to the orginal grade level. Rock slope protection would be placed at each abutment (2,045 cubic yards at the western abutment and 6,005 cubic yards at the eastern abutment), but would not extend below the Ordinary High Water Mark.
        Contact Information
                        Name
                    
                    
                        Laura Peterson-Diaz
                    
                
                        Agency Name
                    
                    
                        California Department of Fish and Game
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Cities
                
                Paso Robles, San Luis Obispo
            
                    Counties
                
                San Luis Obispo
            
                    Cross Streets
                
                
                    Limits of project KP 51.8/90.6 (PM 32.2/56.3)
                
            
                    State Highways
                
                
                    Highway 41
                
            
                    Airports
                
                
                    Paso Robles
                
            Notice of Determination
                        Approving Agency
                    
                    
                        California Dept. of Fish and Game                               
                    
                
                            Approving Agency Role
                        
                        
                            Responsible Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
