Bombay Beach Plot Study (Bombay Beach Vegetation Project)
20 Documents in Project
Summary
SCH Number
1999091142
Lead Agency
Imperial Irrigation District
Document Title
Bombay Beach Plot Study (Bombay Beach Vegetation Project)
Document Type
NOD - Notice of Determination
Received
Posted
1/7/2026
Document Description
The Project is limited to impacts to streams and lakebed associated with the construction of a wetland enhancement. The purpose of the Project is to retain and expand vegetation cover on the playa, enhance existing wetland vegetation plant growth and survival, and help mitigate dust emissions to reduce particulate matter air pollution (e.g., PM10). The Project components include the following: stormwater harvesting bunds, a stormwater berm, temporary access routes, irrigation features for revegetation and vegetation enhancement, a sand fence, and a permanent access road.
Contact Information
Name
Davydova-Flores
Agency Name
Department of Fish and Wildlife
Job Title
Senior Environmental Scientist Specialist
Contact Types
Responsible Agency
Phone
Name
Jessica Humes
Agency Name
Imperial Irrigation District
Job Title
Sr Environmental Project Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Counties
Imperial
Regions
Southern California, Unincorporated
Parcel #
002-640-002
State Highways
CA-111
Waterways
Salton Sea, Unnamed Wash
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Imperial
Final Environmental Document Available at
https://files.ceqanet.lci.ca.gov/85117-17/attachment/7gxtP2dkqCRv2hPO3yDGMpaJQZC78xTA1yWgpPVLNm3IkpoiFQ-zAji9sWghqxgE-VOd_nzapvr3rWdB0
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
