Crossings at El Dorado (Streambed Alteration Agreement EPIMS Notification No. ELD-51175-R2)

7 Documents in Project

Summary

SCH Number
1997092074
Lead Agency
El Dorado County
Document Title
Crossings at El Dorado (Streambed Alteration Agreement EPIMS Notification No. ELD-51175-R2)
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2026
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number ELD-51175-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, El Dorado RV Resort and Campground LLC. The project is limited to the installation of two pairs of 48-inch storm drains in two separate locations within Mound Springs Creek. Campground driveways will be constructed over both locations with a width between 25 and 30 feet. Rock for erosion control will be installed at each inlet/outlet. At Location 1, approximately 20 by 20 feet of riprap will be installed at both the inlet and outlet. At Location 2, approximately 35 by 15 feet of riprap will be installed at the inlet and 15 by 15 feet at the outlet.

Contact Information

Name
Caitlyn Oswalt
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Robert Peters
Agency Name
El Dorado County
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Regions
Northern California
Other Location Info
two locations along Mound Springs Creek and US Hwy 50 and El Dorado Road
Other Information
& 38.71029, -120.84609

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
El Dorado
Final Environmental Document Available at
CDFW Regional office

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print