Additional Charging Station Installation – First Amendment to Harbor Development Permit No. 26-005(1)
2 Documents in Project
Summary
SCH Number
2026041260
Public Agency
Port of Long Beach
Document Title
Additional Charging Station Installation – First Amendment to Harbor Development Permit No. 26-005(1)
Document Type
NOE - Notice of Exemption
Received
Posted
9/15/2026
Document Description
The First Amendment to Level I HDP 26-005(1), approved by the Director of Environmental Planning on August 10, 2026, permits Total Terminals International, LLC (TTI) to install two additional human-operated electric utility tractor rig (UTR) charging stations at their Pier T marine terminal. The two additional charging stations will be located in the same location as the previously approved electric UTR charging stations Site work involves installation of above-ground rigid metal conduit and conductors, charger equipment mounted on steel support frames, local disconnects, and protective bollards. Level I HDP 26-005 was originally issued to TTI on April 2, 2026, to install up to three electric utility tractor rig charging stations at Pier T, with power supplied from an existing on-site electrical substation.
Contact Information
Name
Matthew Jolliff
Agency Name
Total Terminals International, LLC
Job Title
Senior Manager of Sustainability
Contact Types
Project Applicant
Phone
Name
Jennifer Williams
Agency Name
Port of Long Beach
Job Title
Environmental Specialist Assoc.
Contact Types
Lead/Public Agency
Phone
Location
Cities
Long Beach
Counties
Los Angeles
Regions
Southern California
Other Location Info
Pier T, Long Beach
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
State CEQA Guidelines Categorical Exemption Section 15301 (Class 1. Existing Facilities).
Reasons for Exemption
The Class 1 Categorical Exemption consists of the operation, repair, maintenance, permitting, leasing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use. The Project involves installation of two additional human-operated electric utility tractor rig (UTR) charging stations at TTI’s existing Pier T marine terminal. The two additional charging stations will be located in the same location as the previously approved electric UTR charging stations.
Exempt Status
Categorical Exemption
Type, Section or Code
State CEQA Guidelines Categorical Exemption Section 15303 (Class 3. New Construction or Conversion of Small Structures).
Reasons for Exemption
The Class 3 Categorical Exemption consists of construction and location of limited numbers of new, small facilities or structures, installation of small new equipment and facilities in small structures, and the conversion of existing small Port of
structures from one use or another, where only minor modifications are made in the exterior of the structure. Site work involves installation of above-ground rigid metal conduit and conductors, charger equipment mounted on steel support frames, local disconnects, and protective bollards.
Furthermore, the Port has determined that none of the exemptions to the exceptions set forth in State CEQA Guidelines Section 15300.2 foreclose the use of the categorical exemptions in Sections 15301 and 15303. Therefore, the project is exempt from CEQA and no further environmental review is required.
County Clerk
Los Angeles
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.