Cascade Boulevard Over Moody Creek Bridge Replacement Project

5 Documents in Project

Summary

SCH Number
2022020124
Lead Agency
City of Shasta Lake
Document Title
Cascade Boulevard Over Moody Creek Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/14/2026
Document Description
WDID 5A45CR00701 The purpose of the Project is to replace the functionally obsolete concrete bridge on Cascade Boulevard over Moody Creek with a new structure that meets current structural and geometric design standards. The new concrete bridge will provide safe, reliable service and enhance safety for vehicular, pedestrian, and bicycle traffic. The structure will be approximately 52 feet long and 40 feet wide, with a 36-foot-wide roadway that includes two 12-foot travel lanes and two 6-foot shoulders/Class II bike lanes. To maintain traffic during construction, Cascade Boulevard will be detoured just west of the existing bridge using a temporary low water crossing constructed on fill material.

Contact Information

Name
Lynn Coster
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Name
William Bond
Agency Name
City of Shasta Lake
Job Title
City Engineer
Contact Types
Project Applicant

Location

Cities
Shasta Lake
Counties
Shasta
Regions
Northern California
Township
33 N
Range
04 W
Section
29
Base
MDB&M
Other Location Info
Cascade Boulevard

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Shasta
Final Environmental Document Available at
The Initial Study/Mitigated Negative Declaration is available to the general public at: https://ceqanet.lci.ca.gov/Project/2022020124.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print