Asai Farm Stormwater Pond Project

16 Documents in Project

Summary

SCH Number
2022010100
Lead Agency
East Turlock Subbasin Groundwater Sustainability Agency (ETS GSA)
Document Title
Asai Farm Stormwater Pond Project
Document Type
NOD - Notice of Determination
Received
Posted
9/4/2026
Document Description
The proposed project would repurpose up to approximately 8 acres of irrigated agricultural land in Merced County through the construction of a passive stormwater capture and infiltration pond system under a I0-year Incentive Agreement with ETSGSA. The stormwater capture and infiltration pond system, or stormwater pond, would be constructed approximately 15 feet from an existing agricultural drainage ditch. The stormwater pond would range from one to three feet in depth, requiring some excavation and grading. The stormwater pond would be designed to capture and retain storm water runoff from surrounding lands.

Contact Information

Name
Mike Tietze
Agency Name
East Turlock Subbasin GSA
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Unincorporated Area
Counties
Merced
Regions
Northern California, Unincorporated
Cross Streets
Cortez Avenue
Zip
95380
Total Acres
8
Parcel #
041-110-024
State Highways
State Route 99
Railways
Santa Fe Railroad
Airports
Turlock Municipal Airport
Schools
N/A
Waterways
Mustang Creek
Township
5S
Range
11E
Section
13
Base
MDB&M

Notice of Determination

Approving Agency
East Turlock Subbasin
Approving Agency Role
Lead Agency
Approved On
County Clerk
Merced
Final Environmental Document Available at
https://turlockgroundwater.org/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print